banner_wyszukiwarka(4).jpg

Drum fan WBS 1

The Symbol : 9892718

WBS-1 drum fan for industrial equipment, ideal for ensuring clean air and air contaminated with gases or dust. Solid steel construction, accessories, additional equipment. An excellent choice of supply and exhaust systems. High efficiency, exhaust fumes and energy efficiency, the fan has proven itself in industrial areas, production halls and warehouses.

The Availability Of : Średnia dostępność

Price: 1490.00

Price: 1490.00

opak
SMS: +48606376838

Availability and delivery

Shipping within : 5 days
EAN :
5905679892718

Industrial drum fan WBS-1

WBS – WBS single-stream drum fans are designed for pumping clean air 
and contaminated with gases or dust with a density of up to 1.2 kg/m³ and a temperature of up to 45°C.

  • They can work as supply or exhaust fans.
  • All fan components
    are made of steel sheet
    painted or galvanized,
    providing good corrosion protection.
  • The company's offer includes
    also WBS-6 fan
    in the aluminium version, i.e.
    WBS-6L.

Fan dimensions:

image

Specifications:

Type
Type
Efficiency
Capacity [V m³/s]
Accumulation
Compress [Pa]
Power
Power [kW]
Turnover
Rotations [min⁻¹]
Current
In current [A]
Power
Feeding [V]
Max. temp.
Work
Max working temp. [°C]
Efficiency
Efficiency [%]
Power Input
Input power [kW]
Measurement category
Measurement category
Fitness category
(static/total)
Category efficiency (static/total)
Volume
Noise Lwa [dB(A)]
Scales
Weight [kg]
WBS-1 0.111 850 0.55 2820 3.4 1~ 45 42.0 0.489 B, D total 86 14
WBS-1 0.111 850 0.55 2820 1.35 3~ 45 42.0 0.489 B, D total 86 14
WBS-2 0.140 680 0.37 2820 2.5 1~ 45 40.3 0.34 B, D total 83 13
WBS-2 0.140 680 0.37 2820 1.00 3~ 45 41.5 0.33 B, D total 83 13
WBS-3 0.056 480 0.12 1380 1.35 1~ - - - - - 83 7.5
WBS-3a 0.099 450 0.242 2120 1.05 1~ 45 n.d. 0.160 B, D total 58 7.5
WBS-4 0.181 500 0.37 2800 2.5 1~ 45 39.7 0.330 B, D total 70 13
WBS-5 0.028 290 0.105 1500 0.46 1~ - - - - - 81.180 5
WBS-5a 0.056/0.042 275/420 0.105/0.176 1400/2050 0.46/0.78 1~ - - 0.125 - - 65 5
WBS-6 0.042 200 0.08 2350 0.35 1~ - - - - - 64 2.2
WBS-6a 0.035 210 0.08 2350 0.35 1~ - - - - - 63 2.2
WBS-6a AL 0.03 1400 0.13 - 1~ - - - - - - 57 2.2
WBS-7 0.022 200 0.06 2250 0.30 1~ - - - - - 66 1.9

Parameters :
Brand:
Konwektor
Energy efficiency class:
B
Material:
galvanized sheet
Status:
New
Voltage / Power:
230V

Safety Information

General Safety Rules for Mechanical Fans for Building Ventilation

Mechanical fans are a key component of mechanical ventilation systems in residential, commercial and industrial buildings. Their correct installation, operation and maintenance are crucial for the safety of users, the efficiency of the system and the durability of the device.

Principles of safe use and installation

Installation by qualified personnel only
A mechanical fan should be installed by persons with appropriate electrical qualifications and experience in the installation of mechanical ventilation systems.

Correct Mounting Location

The device should be installed in accordance with the installation design and manufacturer's documentation.

Keep a safe distance from heat sources, fire, gas installations and flammable materials.

Safe electrical connection

The electrical installation must be carried out in accordance with the applicable standards and manufacturer's requirements.

The fan should be connected to a properly protected electrical circuit with proper grounding.

Any service or installation work should be performed with the power supply disconnected.

Protection against moisture and dust

Use fans for their intended purpose – wet room models must have an appropriate IP rating.

Do not install fans where there is a risk of water damage, unless they have been designed to do so.

Proper fixation of the device

The device must be mounted stably to prevent vibration, noise and possible mechanical damage.

In the case of ceiling or roof fans, additional vibration protection must be used.

Ensuring free air flow

Do not obstruct fan inlets or outlets.

Regularly check the patency of the ventilation ducts to avoid overloading the motor.

Potential risks

Electric shock – resulting from improper connection, damaged wires or lack of grounding.

Engine overheating – caused by a lack of obstruction of ventilation ducts or a blockage of the rotor.

Risk of fire – when the fan is installed near flammable materials or in unsuitable environments.

Noise and vibration – incorrect installation can lead to excessive noise and damage to the building structure.

Decrease in air quality – an incorrectly selected fan can result in insufficient air exchange, which negatively affects the health of users.

Maintenance and inspections

Regularly clean the fan of dust, dust, and other debris to maintain its performance.

Check the condition of electrical cables, connections and the rotor.

Perform periodic technical inspections in accordance with the manufacturer's recommendations.

If abnormalities are detected, such as excessive noise, vibrations, burning smell or problems with the operation of the device – disconnect the power supply and contact an authorized service center.

Summary

Mechanical fans are reliable devices that ensure proper air circulation in buildings, but they require proper installation and operation.
Compliance with the above safety rules minimizes the risk of failure, increases the efficiency of the ventilation system and extends the life of the device.

Manufacturer details

Konwektor
Wojska Polskiego 6
87-600 Lipno
Poland

606376838
info@wentec.pl

There is currently no comments or ratings for this product.
Product assessment
Ask a question

Zobacz co o nas mówią klienci